CI Library
How the library grows
Six independent tracks, one loop from theory to practice.
The Collective Intelligence Library is in its construction and simulation phase. The work runs as six tracks. Each track moves on its own, and each track can take outside contributions on its own.
Follow the tracks ↓
- Phase
- Construction & Simulation
- Tracks
- 6
Construction & Simulation
Build the simulation infrastructure and test defences inside it. The six tracks below all belong to this phase.
Practice
Test the policies and defences that win in simulation with real organisations, in the real world.
Each track answers one question and moves through its own milestones. Together they turn the library from an engine into shared infrastructure.
- Milestone states
- Done
- Active
- Next
- Later
Metrics & Coupling
What should we measure, and how do systems connect?
- Two-layer metric frameworkDone
- Cross-disciplinary catalogActive
- Calibration against known sourcesNext
- Multi-domain coupling contractNext
- Coupled system measured end to endLater
Scenarios
Which failures should we be able to rehearse?
- First scenario benchmarkedDone
- Detailed economic modelActive
- Political & cultural modelsActive
- Coupled disempowerment suiteNext
- AI epistemics scenarioNext
- Runnable canonical futuresLater
Mechanisms
Which parts can the field share?
- Typed read/write declarationsDone
- Markets, voting, networksActive
- Imports from more disciplinesNext
- Contribution pathwayNext
- First external module mergedLater
Interface & Interoperability
Can people outside the code see the model?
- Live showcaseDone
- Assumption-inspection viewsActive
- Machine-readable scenario pagesNext
- Interop with other testbedsLater
Agents
Who can live inside a scenario?
- Rule-based agentsDone
- Learning agentsActive
- Active inference agentsActive
- Deliberative reasoning agentsNext
- Language-model agentsLater
- Large-scale LLM populationsLater
Performance & Scale
How large can a population get?
- Seed-parallel runsDone
- Population-scale profilingNext
- Parallel engine paths in JAXNext
- 10,000+ agents on one GPULater
Closing the loop
All six tracks belong to the construction and simulation phase. The phase after it is practice: testing the policies and defences that win in simulation with real organisations. That closes the loop between theory and practice, and it is the point of the whole pipeline.